. >> the way that we often do buildings in the city are often projects in the city is we go out and we do a low bid. somebody bids on something, we have to do everything that's expected out completely. and everything after that thorable change prosecretary is very difficult. spec ed out. >> we use design bid delivery method. in this one we did a construction manager gc, which really means that we bring the contractor on board as we design and they participate in the design. it brings a lot of collaboration. >> the department of public works decided to try a more team oriented approach with this project. the best value approach. they really went to to us come on board as a team member and work with them. >> what that meant was the contractor allowing key subcontractors such as the electrical, mechanical, plumbing systems, would always be reviewed and looked at for constructability, for cost constraints, for scheduling. >> and it was a risk for the city. it was a change for the city, it was something very, very different. we met all of our project parameters, the budget, the schedule. we